Get all requests
Get all requests that overlap the start…end window.
The window between start and end may span at most 1826 days (5 years). Wider ranges are rejected with a 400 response, so page through longer periods in smaller windows.
Authorizations
Query Parameters
Date/time in ISO 8601 format, e.g. 2026-06-01 (interpreted as UTC midnight) or 2026-06-01T09:00:00Z. Always include a time zone designator (Z for UTC) when sending a time of day. Localized formats such as 01.06.2026 or 06/01/2026 are misinterpreted and must not be used. The window between start and end may span at most 1826 days (5 years). Wider ranges are rejected with a 400 response, so page through longer periods in smaller windows.
Date/time in ISO 8601 format, e.g. 2026-06-01 (interpreted as UTC midnight) or 2026-06-01T09:00:00Z. Always include a time zone designator (Z for UTC) when sending a time of day. Localized formats such as 01.06.2026 or 06/01/2026 are misinterpreted and must not be used. The window between start and end may span at most 1826 days (5 years). Wider ranges are rejected with a 400 response, so page through longer periods in smaller windows.
PENDING, APPROVED, DECLINED, CANCELED Response
Successful response
For day-based leave types: whether the absence starts in the morning (the whole first day counts) or afternoon (only the second half of the first day). Ignored for hour-based leave types.
morning, afternoon For day-based leave types: whether the absence ends at lunchtime (only the first half of the last day) or end_of_day (the whole last day counts). Ignored for hour-based leave types.
lunchtime, end_of_day days, half_days, hours, minutes_30, minutes_15, minutes_10, minutes_5, minutes_1 Linear_all_have_to_agree, Linear_one_has_to_agree, Parallel_all_have_to_agree, Parallel_one_has_to_agree